Analysis of the Status Quo and Development Trend of China Biomass Energy Regional Market 2018

2019-04-08 10:07:00 616

Biomass energy has received increasing attention due to its characteristics of being green, low-carbon, clean and renewable. China is rich in biomass energy, and rationally utilizing and developing existing resources and transforming them into the energy power necessary for daily economy and life is an important part of promoting China's energy production and consumption reform.

Development Priorities of Various Regions

With the implementation of policies and technological advances in the development and utilization of biomass energy, various regions have also achieved certain achievements in the development of biomass energy. China has vast territory and abundant resources, and the biomass resources in each region are different, which determine that different regions in China have different focuses on the development and utilization of biomass energy.

According to the data released by the China Association for the Promotion of Industrial Development Biomass Energy Industry Branch (formerly China Biomass Energy Industry Alliance) in June 2018, waste-to-energy projects are mainly concentrated in East China and North China, especially in the relatively developed East China, the development scale is relatively large, and its proportion of installed capacity of waste-to-energy projects in the country is as high as 56%. The agricultural and forestry biomass power generation projects are mainly concentrated in North China, Northeast China, Central China and East China with abundant crops. The crop straw resources in northwestern and northwestern areas are relatively scarce, and the collection and transportation of raw materials in mountainous areas are difficult. Therefore, there are few agricultural and forestry biomass power generation projects in these areas.

Waste-to-energy projects – No. 1 in Zhejiang Province

Quantity – Zhejiang Province ranks No. 1 by scale with 53 projects

 

垃圾发电项目数量TOP10

Top 10 Provinces by Quantity of Waste-to-energy Projects

浙江省

Zhejiang Province

山东省

Shandong Province

江苏省

Jiangsu Province

广东省

Guangdong Province

安徽省

Anhui Province

福建省

Fujian Province

四川省

Sichuan Province

湖北省

Hebei Province

河北省

Hebei Province

上海市

Shanghai

Installed capacity of power generation –Zhejiang Province ranks No. 1 by 1.331 million kilowatts

 

垃圾发电装机容量TOP10(万千瓦)

Top 10 Provinces by Installed Capacity of Waste-to-energy Projects (10,000 kW)

浙江省

Zhejiang Province

江苏省

Jiangsu Province

山东省

Shandong Province

广东省

Guangdong Province

安徽省

Anhui Province

福建省

Fujian Province

四川省

Sichuan Province

上海市

Shanghai

河北省

Hebei Province

湖北省

Hubei Province

Power generation on-grid: Zhejiang Province ranks No. 1 by 53.1 kWh

 

垃圾发电上网电量TOP10(亿千万时)

Top 10 Provinces by Power Generation On-Grid of Waste-to-Energy Projects (100 million kWh)


Agricultural and forestry biomass power generation project –Shandong Province ranks No. 1

Quantity – Shandong ranks No. 1 by scale with 43 projects

 

农林生物质发电项目数量TOP10

Top 10 Provinces by Quantity of Agricultural and Forestry Biomass Power Generation Projects

Installed capacity of power generation –Shandong Province ranks No. 1 by 1.26 million kW


 

农林生物质发电装机容量TOP10(万千瓦)

Top 10 Provinces by Installed Capacity of Agricultural and Forestry Biomass Power Generation (10,000 kW)

Power generation on-grid: Shandong Province ranks No. 1 by 6.3 billion kWh


 

农林生物质发电上网电量TOP10(亿千瓦时)

Top 10 Provinces by Power Generation On-Grid of Agricultural and Forestry Biomass Power Generation Projects (100 million kWh)


Biogas power generation project - Jiangsu Province and Guangdong Province both take the lead

Quantity: Jiangsu Province boasts the highest number, with 19 projects


沼气发电项目数量TOP10

Top 10 Provinces by Quantity of Biogas Power Generation Project

Installed capacity of power generation: Guangdong Province ranks No. 1 by 67,900 kW

 

沼气发电装机容量TOP10(万千瓦)

Top 10 Provinces by Installed Capacity of Biogas Power Generation (10,000 kW)

Power generation on-grid: Guangdong Province ranks No. 1 by 2.93 kWh


 

沼气发电上网电量TOP10(亿千瓦时)

Top 10 Provinces by Power Generation On-Grid of Biogas Power Generation Projects (100 million kWh)


Garbage Disposal Ranking

(Unit: 10,000 tons)

 

垃圾处理量TOP10(万吨)

Top 10 Provinces by Garbage Disposal (10,000 tons)


The national biomass power generation construction varies during the 13th Five-Year Plan period

Quantity of bio-natural gas demonstration counties is expected to reach 160 in 2020

According to the different regional resources, the scales of various types of biomass energy construction formulated by the state have different emphases. The 13th Five-Year Plan for Biomass Energy Development issued by the National Energy Administration clarifies the layout of different biomass energy sources in various regions.

According to the national bio-natural gas construction layout, the number of bio-natural gas demonstration counties will reach 160 by 2020, and the number of large planting and breeding counties will reach 300.

 

Box 3 National Biogas Construction Layout during the 13th Five-Year Plan Period

S/N

Region

Key provinces

Number of large farming and breeding counties

Number of demonstration counties to be built by 2020

Theoretical straw resources (10,000 tons)

Theoretical fecal resources (10,000 tons)

Biogas development scale (100 million cubic meters / year)

1

North China

Hebei, Inner Mongolia, etc.

37

22

5550

9250

11

2

Northeast

Liaoning, Jilin, Heilongjiang

57

36

8550

14250

18

3

East China

Jiangsu, Zhejiang, Anhui, Jiangxi, Shandong, etc.

66

32

9900

16500

16

4

Central China

Henan, Hubei, and Hunan

69

32

10350

17250

16

5

South China

Southwest

Guangxi, Chongqing, Sichuan, etc.

34

16

5100

8500

8

6

Northwest

Shaanxi, Gansu, Xinjiang, etc.

37

22

5550

9250

11

Total

300

160

45000

75000

80

The planned utilization of biomass-formed fuels in the Beijing-Tianjin-Hebei-Shandong region, the Yangtze River Delta and the Central and Eastern region will respectively reach 6 million tons, 6 million tons and 9 million tons by 2020, respectively, and industrial park heating and commercial facilities combined heating and cooling supply and rural residents' heating are the key to construction.

 

Box 4  National Biomass Briquettes Fuel Construction Layout during the 13th Five-Year Plan period

S/N

Key region

Key provinces

Key points

Planned annual utilization in 2020 (10,000 tons)

Alternative coal consumption (10,000 tons of standard coal)

1

Beijing-Tianjin-Hebei-Shandong

Beijing, Tianjin, Hebei, Shandong, etc.

Rural residents' heating, industrial park heating and commercial facilities combined heating and cooling supply

600

300

2

Yangtze River Delta

Shanghai, Jiangsu, Zhejiang, Anhui, etc.

Industrial park heating and commercial facilities combined heating and cooling supply

600

300

3

Pearl River Delta

Guangdong, etc.

Industrial park heating and commercial facilities combined heating and cooling supply

450

225

4

Northeast

Liaoning, Jilin, Heilongjiang

Rural residents' heating, industrial park heating and commercial facilities combined heating and cooling supply

450

225

5

The Central and Eastern region

Jiangxi, Henan, Hubei, Hunan, etc.

Industrial park heating and commercial facilities combined heating and cooling supply

900

450

6

Total

 

 

3000

1500

East China is still the key area for waste incineration construction and direct combustion of agricultural and forestry biomass for power generation. The planned installed capacity of waste-to-energy power generation in 2020 is expected to reach 3.1 million kilowatts and the planned installed capacity of direct combustion of agricultural and forestry biomass for power generation is expected to reach 2.1 million kilowatts.

 

Box 5 National Agricultural and Forestry Biomass and Waste Incineration Power Generation Construction Layout during the 13th Five-Year Plan period 

S/N

Region

Key provinces

Waste incineration power generation

Direct combustion of agricultural and forestry biomass for power generation

Waste disposal capacity (10,000 tons / day)

Planned inst