Beijing Olympic Village Beixiaohe Sewage Treatment Plant Projectreturn

Reactor type: radial flow sedimentation tank
Reactor size: Φ10.7m-3.6m (H)
Project location: Chaoyang District, Beijing
Construction date: April 2006

Current location:
Home > Project Cases > Equipment > Beijing Olympic Village Beixiaohe Sewage Treatment Plant Project
Sewage flows slowly towards the periphery of the tank along the radial direction. Suspended solids settle during the flowing process and enter the sludge hopper along the slope of the bottom of the tank, and clear water overflows from the periphery of the tank out of the canal. The mud scraper blade scrapes the sludge sunk to the bottom of the tank to the sludge hopper in the center of the tank, and then discharges the sludge through gravity or sludge pump.
The main function is to remove the sludge settling in the sedimentation tank and the floaters on the water surface. This project is used to treat animal excrement and adopts anGlass-Fused-to-Steel Tanks with mud scraper and effluent weir inside.